Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Environmental And Operating Conditions; Space Requirements; Connecting The Unit - Loctite Rc18 Bedienungsanleitung

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

4

Installation

4.1

Environmental and Operating Conditions

– Keep the pressure hose as short as possible. Short switch-on and switch-off times for
the dispensing valve are within reach.
– Keep product feed lines as short as possible. The shorter the feedline the smaller the
specific resistance and the lower the dispensing pressure can be. Avoid kinking.
– In any cases, the pressure hose and product feedline should not be longer than 2 m.
– Do not use inflexible hoses and feed lines, so that unnecessary loads on the fittings will
be avoided.
– Keep all fittings tight.
– No direct sunlight; no UV light.
– No condensing humidity.
– No splash water.
4.2

Space Requirements

4.3

Connecting the Unit

• Use only the cable and hose sets supplied.
• Connect power cord to power supply socket 6.
• Connect air pressure supply to pneumatic connection 8.
• Connect dispense valve:
11

Kapitel

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

97009

Inhaltsverzeichnis