Herunterladen Inhalt Inhalt Diese Seite drucken

Carrying Out A Test Run - Zehnder Pumpen KOMPAKTBOY Serie Gebrauchsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

!
The lifting unit Kompaktboy Single has been prepared by the factory for using the lower
inlet (DN 100 in inlet height 180 mm). If other inlets are used, the factory setting of the
control must be changed accordingly to the values in below table.
of the control ZPS 1
Inlet height
180 mm
250 mm
from above:
428 mm

6.3 Carrying out a test run

1.
The inspection cover is opened after activating the mains voltage.
2.
The valves in the inlet and on the pressure side have to be fully opened.
3.
On the control ZPS 1, press the button "AUTO"
4.
pump switches on. After switching on the pump, stop the water inlet.
5.
6.
7.
At the end of the pumping process, the tank should be almost empty, with the pump
8.
Check that the end of the dynamic pressure pipe is free. It must not submerge in
water (display on the control: 0 cm). The dynamic pressure pipe must be ventilated
ter when stopping the pump, the installation of the control line should be checked.
Chapter 5.8.2. "Laying and connecting the control line"
9.
process (loud noise of the pump), the run-on time has to be extended in the param-
eter menu.
10.
11.
The test run is completed when closing the inspection cover.
76
Shut down point
Switch-on point
3 cm
5 cm
3 cm
10 cm
3 cm
25 cm
Operating manual of the control ZPS 1
Kompaktboy Single
Flood
7 cm
15 cm
29 cm
en English
Operating manual
Switching volume
Run-on time
19 l
26 l
45 l
3 s
3 s
3 s
-

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Kompaktboy 1,1Kompaktboy 1,5Kompaktboy 3.0

Inhaltsverzeichnis