The lifting unit Kompaktboy Double has been prepared by the factory for using the lower
inlet (DN 100 in inlet height 180 mm). If other inlets are used, the factory setting of the
control must be changed accordingly to the values in below table.
of the control ZPS 2
Switch-off
Inlet height
point
180 mm
3 cm
250 mm
3 cm
from above:
3 cm
428 mm

6.3 Carrying out a test run

1.
The inspection cover is opened after activating the mains voltage.
2.
The valves in the inlet and on the pressure side have to be fully opened.
3.
On the control ZPS 2, press the button "AUTO"
4.
pump switches on. After switching on the pump, stop the water inlet.
5.
6.
7.
At the end of the pumping process, the tank should be almost empty, with the pump
8.
Check that the end of the dynamic pressure pipe is free. It must not submerge in
water (display on the control: 0 cm). The dynamic pressure pipe must be ventilated
ter when stopping the pump, the installation of the control line should be checked.
Chapter 5.8.2. "Laying and connecting the control line"
9.
process (loud noise of the pump), the run-on time has to be extended in the param-
eter menu.
10.
11.
The test run is completed when closing the inspection cover.
Kompaktboy Double
Switch-on
Peak load
point
5 cm
10 cm
25 cm
Operating manual of the control ZPS 2
Flood
(on)
6 cm
7 cm
11 cm
15 cm
27 cm
29 cm
en English
Operating manual
Switching
Run-on time
volume
33 l
3 s
47 l
3 s
80 l
3 s
-