Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning And Operation; Checking The Direction Of Rotation (Only With The 400-V Version); Parameters Of The Control - Zehnder Pumpen KOMPAKTBOY Serie Gebrauchsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6. Commissioning and operation

Before commissioning, all connections have to be checked again for correct installation.
It must have been made sure that the safety regulations have been complied with. Com-
6.1 Checking the direction of rotation (only 400-V version)
With the 400V version, the direction of rotation of the pump has to be checked prior to
actual commissioning.
6.2 Parameter setting of the control
!
depending on the water level in the collecting tank.
Control 400 V
!
In addition observe the additional operating manual for the control ZPS 1.
For repair and maintenance works on the control and/or pump, always disconnect the
power plug from the power socket.
Kompaktboy Single
1.
Insert the CEE plug into the socket.
2.
Screw out the lock screw on top of the pot motor,
observe the direction of rotation at the pump shaft
when the pumps run out.
3.
If the rotation arrow on the pump matches the
observed direction of rotation, everything is okay.
4.
If the pump rotates the wrong way round, two of
the three phases will have to be interchanged by
the electrician.
5.
After checking the direction of rotation, it is abso-
lutely necessary to screw in the lock screw again
and to tighten it!
Control 230 V
en English
75

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Kompaktboy 1,1Kompaktboy 1,5Kompaktboy 3.0

Inhaltsverzeichnis