Herunterladen Inhalt Inhalt Diese Seite drucken

Pressure Line With The Kompaktboy 3.0; Putting On The Ball Check Valve - Zehnder Pumpen KOMPAKTBOY Serie Gebrauchsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.5.2 Pressure line with the Kompaktboy 3.0

i
The sewage check valve, which is required according to pertinent regulations, has to be
mounted with the lifting unit Kompaktboy Single 3.0 in the form of a supplied ball-type
check valves in grey-cast iron.

5.5.2.1 Putting on the ball check valve

Kompaktboy Single
1.
Lay the supplied seal ring (O-Ring DN 100) into
the groove of the pressure outlet of the collecting
tank.
2.
Insert the threaded bolt (M16x60) into hole 1
3.
Put on the supplied ball check valve. While doing
so, arrange the holes/threaded hole congruently.
4.
Screw the nut (M16) on the threaded bolt 1.
5.
Screw in the 3 screws M16x40 and
tighten the 4 screw connections equally cross-
wise.
6.
Put the flange seal DN 100 on the connection
flange of the ball check valve.
7.
Put on the adapter flange. While doing so, ar-
range the holes/threaded holes congruently.
8.
Create screw connections with 4 screws M16x90
and
4 nuts M 16 between the shut-off valve and
adapter flange and equally tighten crosswise.
en English
69

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Kompaktboy 1,1Kompaktboy 1,5Kompaktboy 3.0

Inhaltsverzeichnis