Herunterladen Inhalt Inhalt Diese Seite drucken

Test The Installation; Run Post; What To Do After Post - TANDBERG DLT4000 Installations-Handbuch

Pc-backup-systeme
Vorschau ausblenden Andere Handbücher für DLT4000:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Tandberg Data
Event
1
2
3
4
Tandberg DLT4000 Installation Guide
Installing and Configuring the Tandberg DLT4000 Drive
2.6.

Test the Installation

Topic
Run the Power-On Selftest (POST)

What to Do after POST

2.6.1. Run POST

Action
The indicators on the right front panel turn on sequentially from top
to bottom. All indicators stay on for a few seconds.
All indicators on the left front panel turn on at the same time for
about three seconds and then turn off.
The green Operate Handle, the orange Write Protected, and the
Yellow Use Cleaning Tape indicators turn off. The yellow Tape in
Use indicator blinks while the tape drive initializes.
After initialization, if no cartridge is loaded, the yellow Tape In Use
indicator turns off, the green Operate Handle indicator turns on, the
handle unlatches, and the beeper sounds.
Section
2.6.1.
2.6.2.
2-11

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für TANDBERG DLT4000

Inhaltsverzeichnis