Herunterladen Inhalt Inhalt Diese Seite drucken

Laying And Connecting The Control Line - Zehnder Pumpen Kompaktboy Doppel Gebrauchsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.8.2 Laying and connecting the control line

!
The control line must not be kinked or squeezed.
The control line has to be laid rising steadily and frost-proof.
The control line must not be extended. A continuous pneumatic hose 8/6 mm has to
connected.
Kompaktboy Double
1.
Connect the control line to the tank.
2.
Cut the control line to length using a cutter knife -
cuts by a side cutter lead to hairline cracks in the
control line resulting in malfunctions.
3.
Connect the control line to the control.
According to the working sequence, carry out the
individual intermediate stages on the tank side.
en English
83

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Kompaktboy 1.1Kompaktboy 1.5Kompaktboy 3.0

Inhaltsverzeichnis