Herunterladen Inhalt Inhalt Diese Seite drucken

Commisioning, Operation; Installation - KIPP K1494.01 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5 . Commiss io ni ng , O p era tion
!
WARNING!
Installation by a qualified electricians
The Gateway may only be installed and connected by qualified electricians.
5 .1 I n st allation
The Gateway is mounted without tools on a IEC 60715 mounting rail (top hat rail).
As the Gateway is an open device according to DIN EN IEC 61010-2-201, it must be mounted in such a
way that it is accessible only to authorised personnel and protected against all external influences.
This is the case when installed e.g. in a switch box.
When selecting the enclosure, the specific safety requirements must be taken into account.
1.
Hook the housing onto the mounting rail.
Note the position of the retaining slides.
HEINRICH KIPP WERK GmbH & Co. KG
Heubergstrasse 2
72172 Sulz am Neckar
2.
Fixate the housing by pushing in the individual
retaining slides.
Tel. +49 7454 793-0
Fax +49 7454 793-33
35
info@kipp.com
www.kipp.com
Status: 26.11.2020

Werbung

Kapitel

Inhaltsverzeichnis
loading

Verwandte Produkte für KIPP K1494.01

Inhaltsverzeichnis