Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

2. Installation

A = response level
H = height of the tank
SH = height of the neck
L = probe length (probe)
L1 = installation length
L2 = outside length
L3 = mounting length
MET = maximum immersion depth (= active zone, 25 mm)
Mount the unit vertical from the top.
Mounting length (L3): minimum 60 mm.
For safe and easy mounting use the ifm mounting accessories (Order
no. E43000 - E43007).
Maximum vessel pressure when mounted with mounting acces-
sories: 0.5 bar.
• The units should be used in metal tanks.
Use in plastic tanks is not recommended. When the unit is used in
plastic tanks, malfunctions may occur because the electrical contact
of the medium to the machine ground may be insufficient.
10

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis