Herunterladen Inhalt Inhalt Diese Seite drucken

Conel DRAIN Gebrauchsanleitung Seite 41

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Check list (to be completed by the company performing the work)
Inspections
Installation
General condition
Backflow flap(s)
Emergency flap
Tightness test
Induction (to be given by the company performing the work)
Induction
Induction
Handover
Remarks:
Signature (work performed by):
Signature (work accepted by):
Remarks
Piping systems, connections, flow direction,
supports
Visual inspection: exterior damage, soiling
Tested for functional reliability
Only double backflow stop (type 2),
Section 4.1
Only double backflow stop (type 2),
Section 4.2
Remarks
Functions, operation, operating tips,
troubleshooting, obligatory servicing
Instructions for use
INSTRUCTIONS FOR USE
DRAIN
/ HANDOVER RECORD
O.K.
Yes
not O.K.
No
41

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis