Herunterladen Inhalt Inhalt Diese Seite drucken

Geberit ESG 40/200 Bedienungsanleitung Seite 20

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Operating instructions ESG 40/200
Troubleshooting
If the
or
process has been prematurely aborted due to a malfunction.
Disconnect the mains plug so that the trouble indication goes out and the
malfunction can be corrected.
Error
Cause
and
Malfunction of the
light up
mains voltage
(undervoltage)
Malfunction of the
mains voltage
(overvoltage)
and
Malfunction on the
light up
sleeve during
welding
and
Device
light up
temperature is too
high
and
Ambient
light up
temperature is too
low
,
and
Fault current has
light up
been activated
lights up
Malfunction inside
the device
20
inaktiv / inactive
indicator and an additional indicator light up, the welding
Actions
• Disconnect other devices from the power
supply system
• Use a generator with a higher power
• Connect additional consumers to the mains /
generator
• Check the contacts of the sleeve connection
cable
• Use a new sleeve
• Increase the waiting time between welding
processes
• Set the device up in a location with better
ventilation
• Do not expose the device, the electrofusion
sleeve coupling or the electrofusion tape to
direct sunlight
• Set the device up in a warmer location
• Check all contacts for signs of moisture or
foreign material and dry or remove if necessary
• Return the device to the Geberit service centre

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Esg 160

Inhaltsverzeichnis