Herunterladen Diese Seite drucken

Installing The Product; General Guidelines - Grundfos UNOLIFT Serie Montage- Und Betriebsanleitung

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 70
Accessories
We recommend the following accessories.
Outlet pipe
Designation
Non-
return
valve
Double
nipple
Isolating
valve
Union nut
T-piece,
PVC, 90 °
Elbow,
PVC, 90 °
Pipe,
∅50, 2 m
Thread
tape
*
The Unilift CC pump is supplied with a non-return
valve.
8
Quantity
Unolift
Duolift
CC/
APB/
CC/
APB/
KP
SEG
KP
SEG
-*
1
-*
2
-
1
3
5
1
1
1
1
-
-
2
2
-
-
1
1
-
-
2
2
-
-
1
1
1
1
1
1

3. Installing the product

3.1 General guidelines

The guidelines for correct mechanical installation of
lifting station are according to EN 12056-4.
If the lifting station is installed in a basement with
recurrent penetration of groundwater, we
recommend that you install a drainage pump in a
separate pump sump below floor level. In some
countries the drainage pump is mandatory. If
there is only a risk of penetrating groundwater,
we recommend that you install a float switch
outside the lifting station and connect it to a
controller which indicates high-level alarm in
case of flooding.
Fix the tank to the floor.
We recommend that you connect a diaphragm
pump to the tank to be able to empty the tank
manually.
All outlet pipes from the lifting station, diaphragm
pump and drainage pump must have a backflow
loop, i.e. a bend above the local backflow level.
Commonly, the highest point of the bend must be
above street level. See fig. 2.
Surface water must not be discharged into the
lifting station inside the building. Collect and
discharge surface water outside the building.
Install a non-return valve at the outlet of the lifting
station to prevent backflow.
Fit isolating valves at the inlet and outlet of the
lifting station.
The volume of the outlet pipe above the non-
return valve up to the backflow loop must be
smaller than the effective tank volume. See pos.
7 in figures
1
and 2.
In general, a lifting station for black wastewater
must be vented above roof level. However, it is
permitted to lead the vent pipe into the main
building ventilation system. Place special two-
way venting valves outside the building.
If the wastewater is discharged into a collecting
line, the collecting line must have a filling ratio of
at least h/d = 0.7. The collecting line must be at
least one nominal diameter bigger after the outlet
pipe connection.
Use 45 ° bends to avoid deposits in the pipes.

Werbung

loading

Diese Anleitung auch für:

Duolift serie