3.3 Handling

Before each unit handling operation, check that the lifting capacity of the machinery used is compatible with the
weight of the unit.
Handling must be carried out by adequately equipped qualified personnel.
In all lifting operations, make sure the unit is firmly secured in order to prevent accidental falls or
overturning.
Lifting must be carried out by qualified and authorised personnel taking the necessary precautions; if
carried out incorrectly, lifting can cause serious damage and physical injury.
The handling operations must be carried out slowly and sudden manoeuvres and knocks must be
avoided.
Do not, under any circumstances, stand or pass under or near the unit when it is lifted off the ground.
Use only the lifting system designed and prepared for the unit.
During unloading and positioning of the unit, great care must be taken to prevent sudden or violent manoeuvres, and
the components of the unit must not be used as lifting points.
Make sure the machinery and lifting ropes are of suitable size and capacity and strictly follow their operating
instructions. Use only equipment that is in excellent working order.
Check that the lifting equipment is of suitable size and capacity and strictly follow its operating instructions. Use only
equipment that is in excellent working order.
All work on the unit, including unpacking and connections, must be carried out with the unit resting on the ground.
Refer, in any case, to the lifting instructions provided with the unit.
A pallet is secured under the unit so that it can also be unloaded and handled with a suitable forklift truck.
If anti-vibration mounts are installed under the base of the unit, this must be done with the unit raised by no more than
200 mm from the ground and without putting any parts of the body under it.
Before sliding out the pallet, remove the screws fixing it to the unit.
Use a 10 mm spanner to unscrew the screws that are visible through the slotted holes of the base.
Once the pallet has been removed, the unit must be lifted using only and exclusively slings and the yellow lifting
brackets fixed to the base.
Use suitable shackles to fasten the slings to the lifting brackets.
Translation from original instructions
Packaged Rooftop
26
Fig. 2 Focus on the attachment of the sling to the lifting bracket