Replacing gaskets

In case of a hydraulic leakage, subject the machine to a thorough inspection. If the leakage is caused
by one or more worn gaskets you need to replace them immediately.

Inspection

CAUTION! The 2-post lift has to meet the following demands/standards.
-
When commissioning, check if the manual is complete with EG-declaration of
conformity, standard maintenance protocol and inspection certificate.
-
Every 12 months the lift has to be inspected according to national norms by a specialized
company and/or person.
-
A thorough inspection for deformation by shockloads, corrosion, cracks and deformation
has to be carried out every month when the lift is intensively used.

Maintenance

CAUTION! Checks and maintenance operations may only be performed by specialized mechanics.
-
Check if the lift functions properly previous to each use.
-
In case of uncertainties or deformation, the 2-post lift has to be taken out of use
immediately.
-
Broken parts may only be replaced by original Falco-parts, this may only be done by
specialized mechanics. Failure to heed these instructions may invalidate the warranty.