Herunterladen Inhalt Inhalt Diese Seite drucken

Starting Operation - EuroLite NB-100 ICE Bedienungsanleitung

Bodennebelmaschine low fog machine
Vorschau ausblenden Andere Handbücher für NB-100 ICE:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

(6) DMX IN/OUT
(7) Power supply
(8) Drain tap
(9) Fuse
(10) Remote control sockets
(11) Power switch
(12) Ventilation fan

STARTING OPERATION

Install the device on a plane surface.
The fluid tank of the device needs to be filled with smoke fluid before starting up operation and always
disconnected from the mains as fluid could be spilled.
Only use quality smoke fluids available at your dealer. We recommend high-quality Eurolite smoke fluids (e.
g. EUROLITE Smoke Fluid "P" Profi, 1 l). You must not use substances that are classified as "dangerous
working material" or "inflammable fluids".
If fluid should get into the interior of the device, disconnect from mains immediately and consult a technician.
Fill the chamber with regular ice cubes.
Remote Control
Drainage Container
Firmly attach the included tube to the drainage outtake. Connect the end of the
tube to the drainage container.
When the chamber is filled, gently put the cover back and tighten with the
fixation screw.
Firmly attach the remote control cable to the proper input on the rear of the
machine.
Attention: Drain the water in regular intervals (ca. every 45 minutes).
16/38
51701982_V_1_0.DOC

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis