Herunterladen Inhalt Inhalt Diese Seite drucken

Condensate Drain Hose - STIEBEL ELTRON VRL-C 300 G Premium Installation

Dezentrales lüftungsgerät mit wärmerückgewinnung
Vorschau ausblenden Andere Handbücher für VRL-C 300 G Premium:
Inhaltsverzeichnis

Werbung

INSTALLATIoN
Installation
If the design includes a suspended ceiling, install the suspended
ceiling after installing the profile rails.
The openings for the threaded rods must compensate for move-
ments without transferring any stresses or vibrations to the sus-
pended ceiling panels.
1
2
3
4
5
6
7
1 Threaded rod M8
2 Angled bracket (Z-shaped)
3 Anti-vibration mounts
4 Hexagon nut M8 (2 pce)
5 Hexagon bolt (M8 x 25)
6 Spring washer
7 Washer
f Fit the angled brackets on to the appliance with a washer,
f
spring washer and hexagon bolt.
Material losses
!
f When one threaded rod has been installed, sudden
f
dropping of the appliance on the side that has not
yet been installed can cause damage to the mount-
ing system, appliance or ceiling structure.
f Lift the appliance below the ceiling. Take note of the weight
f
of the appliance and ensure sufficient personnel are availa-
ble. Use lifting gear if required.
f Insert the threaded rods into the angled brackets.
f
f Screw the angled brackets to the threaded rods and anti-vi-
f
bration mount and two hexagon nuts.
f Use a spirit level to check whether the appliance is level
f
horizontally.
f Rotate the hexagon nuts to align the appliance horizontally.
f
To avoid overloading individual fixing points, ensure that the
appliance is evenly supported at all fixing points.
f After alignment, secure the hexagon nuts on the threaded
f
rods with the second hexagon nuts.
www.stiebel-eltron.com
5.4

Condensate drain hose

Material losses
!
The appliance contains a condensate pump. To avoid
damage to the appliance or the fabric of the building, a
condensate drain hose must be connected. To ensure the
condensate drains properly, never kink the condensate
drain hose during installation. The appliance must be
installed horizontally. Lay the condensate drain hose with
a fall of at least 10 %.
The condensate must drain away via the domestic sewer
system or exhaust air connection.
Note
The maximum head of the condensate pump is approx.
4 m.
To prevent any backing-up, the condensate must be able to drain
freely at the end of the condensate hose. The open end must
discharge above the appliance into an open outlet or be routed
into a hose with a larger diameter. If this is not taken into consid-
eration, the float chamber may be completely emptied. Possible
consequences are noise development and a shortened condensate
pump service life.
5.4.1 Option: routing the condensate drain hose out at the
back or through the exhaust air connection
In the delivered condition, a condensate drain hose is installed
and routed out of the appliance at the top. If required based on
local conditions, you can route the condensate drain hose through
the cable entry from the back of the appliance or into the exhaust
air duct.
1 Control panel cover
f Undo the screws and remove the control panel cover.
f
1
VRL-C 300/625/870 |
25

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis