Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance And Cleaning; Electric Shock - Abicor Binzel BRS-LCi VW Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

9 Maintenance and cleaning

9 Maintenance and cleaning
Scheduled maintenance and cleaning is a prerequisite for a long life and a trouble-free operation.
Risk of injury due to unexpected start-up.
For the entire duration of maintenance, servicing, dismounting and repair work, the following instructions
must be adhered to:
• Switch off the power supply.
• Close off the compressed air supply.
• Pull the mains plug.

Electric shock

Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation.
• Replace any damaged, deformed or worn parts.
NOTE
• The maintenance intervals given are standard values and refer to single-shift operation.
• Maintenance and cleaning work may only be carried out by qualified and trained specialists.
• Always wear your personal protective clothing when performing maintenance and cleaning work.
The cleaning station BRS-LCi is virtually maintenance-free. However, it is necessary to regularly clean and
evaluate the mechanically stressed parts in order to maintain its value and to guarantee its full ability to
function.
9.1 Weekly cleaning
1 Check the condition of the milling cutter.
2 Clean the clamping unit or the milling cutter.
9.2 Monthly cleaning
A monthly basic cleaning is recommended, and necessary in case of extreme working conditions.
EN - 14
DANGER
DANGER
BRS-LCi VW

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis