Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Putting Out Of Operation; Maintenance And Cleaning; Electric Shock - Abicor Binzel BRS-CC Betriebsanleitung

Brennerreinigungsstation
Vorschau ausblenden Andere Handbücher für BRS-CC:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

BRS-CC

6 Operation

NOTE
• As the BRS-CC maintenance station is integrated into a welding system, the operating instructions of
• Make sure that the BRS-CC maintenance station is operated with a front sheet only.
1 Switch on the robot control.
2 Start the welding process.
3 Stop the welding process.

7 Putting out of operation

NOTE
• As the BRS-CC maintenance station is integrated into a welding system, putting out of operation
1 Switch off the robot control.

8 Maintenance and cleaning

Scheduled maintenance and cleaning is a prerequisite for a long life and a trouble-free operation. In doing
so, observe the following:
Risk of injury due to unexpected start-up.
For the entire duration of maintenance, servicing, dismounting and repair work, the following instructions
must be adhered to:
• Switch off the power supply and close off the compressed air supply.
• Pull the mains plug.

Electric shock

Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation.
• Replace any damaged, deformed or worn parts.
NOTE
• The maintenance intervals given are standard values and refer to single-shift operation.
• Maintenance and cleaning work may only be carried out by qualified and trained specialists.
• Always wear your personal protective clothing when performing maintenance and cleaning work.

8.1 Weekly cleaning

1 Check the condition of the milling cutter.
2 Clean the clamping unit or the milling cutter.
3 Oil the cutter guidance after approx. 2000 cuts on the lubricating nipple.
the welding components, such as welding torch and robot control system, must be observed during
operation.
depends on the robot control system. Please make sure that the shutdown procedures for all
components integrated in the welding system are strictly observed.
DANGER
DANGER
6 Operation
EN - 16

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis