Herunterladen Inhalt Inhalt Diese Seite drucken

Dust Emission; Contents Of Delivery; Transport And Start Up; Transport And Installation - powermatic PM1500 Gebrauchsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

The specified values are emission levels and are not necessarily to
be seen as safe operating levels. Although there is a correlation
between emission and imission levels, these do not constitute a
basis for determining the necessity of additional safety measures.
Workplace conditions which could influence the noise imission
level include the duration of resonance, spatial particulars, other
noise sources etc. For example, the number of machines and other
work being performed. The permissible workplace levels can vary
from country to country.
This information is intended to allow the user to make a better
estimation of the hazards and risks involved.

4.4 Dust emission

The band saw has been dust emission inspected.
At an air velocity of 20 m/s on the dust port dia 100mm:
Vacuum pressure
Volume flow
The machine meets a workplace dust emission of 2 mg/m³.
4.5 Content of delivery
Band saw
Fence profile
Fence carrier
Resaw guide
Mitre gauge
Saw blade 10mm
Operating manual
Spare parts list

5. Transport and start up

5.1 Transport and installation

The machine will be delivered on an open crate.
For transport use a forklift or hand trolley. Make sure the machine
does not tip or fall off during transport.
The machine is designed to operate in closed rooms and must be
placed stable on firm and levelled ground.
The machine can be bolted down if required.
Downloaded from
www.Manualslib.com
1250 Pa
565 m³/h
Fig 3
manuals search engine
Fig 4
For packing reasons the machine is not completely assembled.

5.2 Assembly

If you notice any transport damage while unpacking, notify your
supplier immediately. Do not operate the machine!
Dispose of the packing in an environmentally friendly manner.
Clean all rust protected surfaces with a mild solvent.
Attach the handle to the hand wheel ( Fig 5)
Fig 5
Place the fence assembly on the guide rail and use the nylon
screws (C, Fig 6) to align the fence profile square to the machine
table.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis