Herunterladen Inhalt Inhalt Diese Seite drucken

Transportation And Handling; Basic Information; Installation And Assembly - Elektror SVD 8 Betriebs- Und Montageanleitung

Vorschau ausblenden Andere Handbücher für SVD 8:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

1.13 Allowed mounting positions
Note!
EN
Fastening to the fan is only permitted via a fi xed
connection!
Do not use expansion joints as a fi xed connec-
tion!
Note!
Installation positions with a vertical drive shaft
halve the life of the ball bearings.
See „5.1 Ball Bearings" for more information.
Mounting only foot /
console
Pos.
1
2
3-6
1
6
without foot
and
pressure
Pos.
mounting
1-6
2 INFORMATION ON TRANSPORT, HAN-
DLNG AND STORAGE OF THE MACHINE

2.1 Transportation and handling

• Before assembling and putting into service, check all parts
for damage during transportation. A blower that is damaged
can present an increased risk to safety and therefore should
not be put into service.
• Do not store the blower unprotected outdoors
(protect against humidity).
• Attach lifting tackle securely. Use only lifting tackle and
load suspension devices which have an adequate load
rating. Make sure transport routes are safe.
14
Mounting foot / console
with mounting on the pres-
or
sure
suction side
up to and including
SVD 14
no limitation
SVD 14
2
4
5
without foot
or
suction side
pressure
suction side
mounting
up to and including
not allowed
Operating and assembly instructions SVD
Note!
The eye bolt on the motor must not be used to lift
the entire blower. This is used if the motor needs
to be (dis-)assembled.
Note!
On devices with in-built frequency converters
(FUK devices):
The frequency converter must never be used to
lift the device or as a climbing aid!
2.2 Storage
• Ensure that the air intake connection and pressure connec-
tion are closed.
3
• Store the blower
-> in its original packaging if possible
-> in a closed room
-> in a dry, dust-free and vibration-free area.
• Storage temperature range from -20°C to +60°C
• After a storage period of 6 months, the blower bearings
and/or motor bearings should be checked before they are
mounted in the blower.
• Devices may be stored for a maximum of 2 years.
3 INFORMATION ON PUTTING INTO
SERVICE

3.1 Basic information

• Prior to the fi rst start-up and before any other start-up, the
proper operating status of the unit must be inspected. Units
that, for example, are found to be defective upon delivery or
during installation, must be examined by qualifi ed technicians.
• Installation, assembly and operation must only be performed
by properly trained and qualifi ed specialists. Operation fol-
lowing incorrect installation, maintenance or unapproved
replacement of components constitutes non-designated use
and renders the warranty void. The resultant risk shall be
borne solely by the customer or owner.

3.2 Installation and assembly

• Protect the blower from the weather and install it in a hori-
zontal position, see also 1.1. For outdoor use, protection
from the weather must generally be provided that fulfi ls
the requirements listed in 1.1 Intended Use and protects
the blower from the infl uences of the weather.
• Do not subject to vibratory or shock loads, now or later
during operation. For permissible blower vibration values, refer
to ISO 14694, BV-3.
www.elektror.com

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis