Herunterladen Inhalt Inhalt Diese Seite drucken

Information On Transport, Handlng And Storage Of The Machine; Transportation And Handling; Information On Commissioning The Machine; Installation And Assembly - Elektror A-HP Betriebs- Und Montageanleitung

Aluminium hochdruckventilator
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Mounting only foot /
EN
console
Pos.
1
2
3-6
1
6
without foot
and
pressure
Pos.
mounting
1-6
2 INFORMATION ON TRANSPORT,
HANDLNG AND STORAGE OF THE
MACHINE

2.1 Transportation and handling

• Before installation and putting into service, check all parts
for transit damage. A damaged blower is a potential safety
hazard and, therefore, should not be put into service.
• Do not leave the blower unprotected in the open
(protect against ingress of moisture).
• Attach hoisting gear securely. Only use hoists and load
suspension devices with suffi cient load-carrying capacity.
Secure the route of transportation.
Note!
The eye bolt on the motor must not be used to lift
the entire blower. This is used if the motor needs
to be (dis-)assembled.
12
Mounting foot / console
with mounting on the pres-
or
sure
suction side
up to and including
not allowed
no limitation
not allowed
2
4
5
without foot
or
suction side
pressure
suction side
mounting
up to and including
not allowed
Operating and assembly instructions A-HP
Note!
On devices with in-built frequency converters
(FUK devices):
The frequency converter must never be used to
lift the device or as a climbing aid!
2.2 Storage
• Ensure that the air intake connection and pressure connec-
tion are closed.
• Store the blower
-> in its original packaging if possible
-> in a closed room
-> in a dry, dust-free and vibration-free area.
3
• Storage temperature range from -20°C to +60°C
• After a storage period of 6 months, the blower bearings
and/or motor bearings should be checked before they are
mounted in the blower.
• Devices may be stored for a maximum of 2 years.
3 INFORMATION ON COMMISSIONING
THE MACHINE

3.1 Installation and assembly

• Protect the blower from the weather and install it in a
horizontal position, see also 1.1. For outdoor use, protec-
tion from the weather must generally be provided that
fulfi ls the requirements listed in 1.1 Intended Use and
protects the blower from the infl uences of the weather.
• Do not subject the blower subsequently to vibration or
impact loads during operation. Permissible vibrational load
on blower: refer to ISO 14694, BV-3.
Measurement at the fl ange bearing shield, preferably
near the bearing
Maximum permissible vibration speed
(Limit values according to ISO 14694:2003 (E),
category BV-3)
At installation
Start-up
Alarm
Shut-down
• The accompanying rubber pads must always be used.
• Do not subject the pads to shearing stresses or tensile forces
• Standard blowers with base:
Bolt securely to a level and fi rm surface at the place of
use, making sure that the surface has adequate load-
bearing capacity and avoiding vibration transmission or
= Measuring point
= Measuring
direction
Rigidly mounted
Flexibly mounted
[mm/s]
[mm/s]
Eff ective value
Eff ective value
[r.m.s.]
[r.m.s.]
4.5
6.3
7.1
11.8
9.0
12.5
www.elektror.com

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis