Herunterladen Inhalt Inhalt Diese Seite drucken

Checking The Rotation Direction; Post-Run - Gardner Denver Elmo Rietschle C-VLR 301 Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6.1.1 Checking the rotation direction

6.1.2 Post-run

Prematic AG, Märwilerstrasse 43, 9556 Affeltrangen www.prematic.ch
The intended direction of rotation of the drive
shaft is shown by the rotary direction arrow
(Fig. 2/O).
a) Start the motor briefl y (max. two seconds) to
check the direction of rotation. When looking at
the motor fan, it must rotate anti-clockwise.
NOTICE
Incorrect direction of rotation
Operating in the wrong direction of rotation leads
to damage to the machine.
For removing accrued dampness and impurities out
of the pump we recommend, let the vacuum pump
post-run with 700 mbar (abs.) approximately 15 to
30 minutes.
Condensate formation and impurities
By heightened condensate formation and impurities
after shutdown of the machine deposits can adhere
to rotors as well as compressor housing and prevent
an starting when restart.
www.gd-elmorietschle.com © Gardner Denver Schopfheim GmbH, Gardner Denver Deutschland GmbH
Commissioning and decommissioning
CAUTION
Tel. 071 918 60 60, Mail: v-g@prematic.ch
19
|

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis