Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Installing Components - OHAUS Scout SJX Serie Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für Scout SJX Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 74
TM
EN-2
SCOUT
SJX SERIES BALANCES

2. INSTALLATION

2.1 Installing Components

Refer to the illustrations and instructions below to identify and assemble your Scout balance
with its components. All components must be assembled before using the balance.
2.1.1 Releasing the Transportation Lock
Release the red transportation lock by turning
Locked
the red pointer 90 degrees counter-clockwise
position
to unlock.
Unlocked
position
Figure 2-1. Transportation Lock
Note:
For SJXN models, the shipping lock needs to be removed (by pulling it out) before installing the
pan.
2.1.2 Installing the Weighing Pan
For SJX/E
Balances with a rectangular pan are placed into the sub-platform as shown and rotated counter-
clockwise until it locks. Round pans are placed straight down on sub-pan.
Figure 2-2. Pan Installation (for SJX/E)
For SJX
Install the stainless steel pan directly on the subplatform.
2.1.3 Capacity Label
(for SJX323N/E and SJX1502N/E)
Attach the capacity label above the screen at the position demonstrated below, and align the
edges with the dotted lines.
Figure 2-3. Capacity label (for SJX323N/E and SJX1502N/E.)
1.800.561.8187
information@itm.com
www.
.com

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis