Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly And Operation - OEG EP-50 Handbuch

Hand-druckprüfpumpe
Vorschau ausblenden Andere Handbücher für EP-50:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
1. Handle sleeve
2. Handle
3. Snap ring
4. Lever
5. Dowel (long)
6. Dowel (short)
7. Piston
8. Steel ball
9. Ø30" O ring
10. Body of pump
11. Flat gasket
12. M8 Worm
13. Cover
1. Connect the high-pressure hose to the pump. Ensure that the flat gasket is properly
inserted inside the hose gland. Fill the water tank with clear water. Pull off the plug
and tighten the pressure relief valve (14). Pump the handle until water flows from the
discharge outlet. Connect the other end of the high-pressure hose to the test subject.
2. Release the air in the tested container before testing.
3. After the pressure has reached the required level, observe the pressure
gauge to check the pressure.
4. After testing, loosen the pressure relief valve (14), release the pressure
and remove the high-pressure hose.
5. Ensure that there is no water remaining in the pump and clean it for further use.
Unit conversion:
1 MPa = 10 bar = 10.197 kgf/cm
OEG – Hand pressure testing pump
14. Pressure relief valve
15. Ø8" O ring
16. Discharge hose
17. Gauge
18. One-way valve
19. On-way spring
20. Plug
21. Ø6" O ring
22. Strainer
23. High pressure hose
24. Water tank
25. M6 Worm
26. Screw nut
2
= 145.038 psi
5
Exploded view

Assembly and operation

3.0
4.0
GB

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis