Herunterladen Diese Seite drucken

Preparing For Installation - Cisco Systems 2924M XL DC Handbuch

Werbung

Preparing for Installation

Step 1
Step 2
78-10499-01
Follow these steps before rack-mounting and grounding the switch or wiring it to
a DC-input power source.
Unpack the shipping box, and verify its contents. In addition to the items
described in the Catalyst 2900 Series XL Installation Guide, the switch is shipped
with a DC terminal block plug installed on the switch back panel.
Obtain the following necessary tools and equipment:
Ratcheting torque screwdriver with a Phillips head that exerts up to
15 pound-force inches (lbf-in.) of pressure
Panduit crimping tool with optional controlled cycle mechanism, model
CT-700, CT-720, CT-920, CT-930, CT-920CH, or CT-940CH
6-gauge copper ground wire (insulated or noninsulated)
Four leads of 12- or 14-gauge copper wire
Wire-stripping tool(s) for stripping both 6- and 12- or 14-gauge wires
Using the Catalyst 2924M XL DC Ethernet Switch
Preparing for Installation
9

Werbung

loading