6. Commissioning, operation

6. Commissioning, operation
WARNING!
Prior to commissioning, the pressure sensor must be subjected to a visual inspection.
Only use the pressure sensor if it is in perfect condition with respect to safety.
6.1 Making the mechanical connection
The sealing faces at the instrument have to be undamaged and
clean.
When screwing the instrument in, the force required to do this
must not be applied through the casing, but only through the
spanner flats provided for this purpose and using a suitable tool.
The correct torque depends on the dimensions of the process
connection and the gasket used (form/material).
Maximum tightening torque
Process connection
G ½ A DIN 3852-E
M14 x 1.5
7/16-10 UNF-2A
¼ NPT
When screwing in, do not cross the threads.
Operating instructions pressure sensor P3427
Tightening torque
60 Nm
60 Nm
20 Nm
34 Nm
GB
Spanner flats
35