Installation

5.1 Installation general

Installing the appliance
1. Placing the appliance (§5.2)
2. Connecting the condensate discharge (§5.3)
3. Connecting the ducts (§5.4)
4. Electric connection
Connecting the mains power, multiple switch and, if neces-
sary, the OpenTherm/eBus coupler (§5.5)
Installation must take place under:

5.2 Placing the appliance

The Renovent Excellent can directly be mounted to the wall
using the suspension brackets supplied for that purpose. For a
vibration-free result the appliance must be mounted to a solid
wall with a minimum mass of 200 kg/m
double panelling or extra studs are required in that case. On
addition, the following aspects must be taken into account.
The appliance must be placed level.

5.3 Connecting the condensate discharge

The condensate discharge line for the Brink Renovent HR is fed
through the lower panel. The condensate must be discharged
through a drainpipe.
The condensate discharge comes separately with the applian-
ce and the installer must screw it into the underside of the ap-
pliance. This condensate discharge connection has an external
connecting diameter of 32 mm.
The condensate discharge line can be glued to it, if necessary
using a square bend. The installer can glue the condensate
discharge in the desired position in the lower part of the ap-
pliance. The drain must discharge under the water level in the
U-trap
Before connecting the condensate discharge to the appliance,
pour water into the U-trap to create an air trap.

5.4 Connecting ducts

To prevent condensation on the outside of the outdoor air sup-
ply duct and the air extract duct from the Renovent Excellent,
these ducts must be provided with an external vapour barrier
as far as the appliance. If Brink synthetic (EPE) pipe is used
here, additional insulation is not necessary.
For optimum fan noise damping, it is recommended to use
appliance and the ducts from and to the dwelling.
2
. A gypsum block or
Renovent Excellent
• Quality requirements ventilation systems dwellings.
• Quality requirements balanced ventilation in dwellings.
• The regulations for ventilation of dwellings and residential
buildings.
• The safety regulations for low-voltage installations.
• The regulations for connection to interior sewers in dwel-
lings and residential buildings.
• Any additional regulations of the local utilities.
• The installation instructions for the Renovent Excellent.
The installation room must be such that a good conden-
sate discharge with air trap and pitch for condensate can
be made.
The installation room must be frost-free.
Make sure there is a free space of at least 70 cm at the
front of the appliance and a free headroom of 1.8 m for
Make sure there is a free space of at least 20 cm above the
display cover so it can always be removed.
Glued connection;
Ø32 mm
Pay attention to crosstalk and installation noise, also for incor-
porated ducts. Design the duct with separate branches to the
valves to prevent crosstalk. If necessary, the supply ducts must
be insulated, for instance when they are installed outside the
insulated envelope.
Preferably use Brink incorporated ducts. These ducts have
been developed with a view to a low duct resistance.
A duct diameter of 180 mm is required for the Renovent Excel-
lent.
Chapter 5
Screw connection
6264-A