Herunterladen Inhalt Inhalt Diese Seite drucken

Grundfos NK Installationsanleitung Seite 12

Atex-approved pumps
Vorschau ausblenden Andere Handbücher für NK:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Back-to-back shaft seals
Pipe connection to primary
shaft seal.
The barrier liquid is directed to the seal faces of the shaft
seals. Both primary and secondary seals are placed in
the seal chamber
Fig. 3
Connections for barrier liquid of
back-to-back arrangement with standard
seals
Is a barrier liquid available in the application?
Description of the barrier liquid:
Chemical composition (if available):
Pressure of the barrier liquid:
System requirements for the barrier liquid:
Does the application require circulation of the barrier liquid?
Comments on circulation for the primary shaft seal:
Comments on dead-end arrangement
More comments/info about your system:
Date:
___________________________________
Grundfos representative
114
Pipe connections to
secondary shaft seal.
Fig. 4
Yes ____ No ____
_______________________________________________
_______________________________________________
____________ ___ [bar]
_______________________________________________
_______________________________________________
Yes ____ No ____ (dead-end arrangement)
_______________________________________________
_______________________________________________
_______________________________________________
_______________________________________________
_______________________________________________
________________________________________________
________________________________________________
________________________________________________
Pipe connections to the cartridge seal. The
direction of the barrier liquid depends on the
direction of rotation of the shaft.
Connections for barrier liquid of
back-to-back arrangement with a cartridge
seal
Date:
___________________________________
Customer representative

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Nkg

Inhaltsverzeichnis