Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

6H, detail 4) Centring the wall on the base frame, install it
- (
in such a way so that the wood dowel is inserted into the frame.
Subsequently, use a rubber mallet if necessary.
(detail 4a) During assembly, take care not to damage
the panel ends.
System configuration (micro-switches)

ALL MODELS

sc) Check that the configuration of the "A" and "B" switches is
(
as per indicated in the diagram and that the "C" switches are posi-
tioned according to the parameters relative to the desired instal-
lation, that is:
1: - turn the switch to ON with the HAMMAM module;
- turn the switch to OFF with the SAUNA module;
2: - turn the switch to ON where installation of the Jacuzzi® audio
kit is planned;
- turn the switch to OFF otherwise;
3: - check that the switch is in the ON position.
4 (only sauna module)
- turn the switch to ON to set a sauna function for a maximum of
12 hours;
- turn the switch to OFF to set a sauna function for a maximum
of 6 hours;
CAUTION: do not set a 12 hour time frame if the
equipment is to be used for personal use.
5: - turn the switch to ON if you wish to carry out a demo function
of the equipment (trade fair, exhibition);
- turn the switch to OFF where normal operation is desired.
6: - turn the switch to ON where installation of the Jacuzzi® remote
control system is planned;
- turn the switch to OFF otherwise;
7: - sauna module: - turn the switch to OFF with the SAUNA mod-
ule;
- hammam module: turn the switch to ON where automatic
filling of the anti-scaling agent is planned.
- turn the switch to OFF otherwise;
8: - press the switch to save the remote control system positioning
(refer to the documentation that comes with the system itself).
Installing the side walls
7, details 1-2) Using the suction lifter, draw the lower side
(
wall towards the base wall (Sauna: wall with vent) and thread the
speaker cables via the grooves (below) of the base wall.
Then connect them to the audio box.
SAUNA+HAMMAM/SAUNA+SHOWER+HAMMAM MODELS:
details1-2) Remove the jumpers (P) and also connect the
(
speakers from the other module to the terminal block.
7, detail 3) Thread the bench light cable (6) into the con-
(
duit and allow it to pass out of the other end until it aligns with
the central hole in the panel.
Apply the foam rubber cylinder to the cable and provisionally
attach it (it will be inserted into the panel hole once the bench
is positioned).
8) Install the lower wall to the base frame so that:
(
- (detail 1) the fasteners located at the ends are inserted into
the fasteners on the base wall,
- (detail 2) the wood dowel is inserted into the frame. Subse-
quently, use a rubber mallet if necessary.
9) Using the suction lifter, draw in the upper wall and in-
(
stall it as per the instructions described above.
Then, thread the following cables into the conduit supplied:
- temperature probe (SO)
- display (1)
These cables must protrude from the display unit.
Check that the walls are completely perpendicular.
Installing the vertical wall
ATTENTION: in the instance of modules which do not
have a shower module, remove the "T" joint.
10, detail 1) Remove the glazing bead from the vertical
(
wall; install the wall so that:
- (detail 2) the end fasteners are inserted into the fasteners on
the base wall,
- (detail 3) the wood dowel is inserted into the frame profile.
- (detail 4) the metal dowels are inserted into the vertical profile.
NOTE: these dowels are adjustable so that any positioning errors
can be corrected.
10, detail 5) Attach the profile to the metal dowels.
(
SAUNA + SHOWER/HAMMAM + SHOWER MODELS:
10a, details 1-2-3) Remove the glazing bead and then
(
attach the vertical profile to the vertical wall.
10a, details 4-5) Screw the supports under the wall and
(
install it to the lower glass frame in such a way that the metal
dowels are inserted into the vertical profile.
NOTE: these dowels are adjustable so that any positioning errors
can be corrected.
10a, details 6-7-8-9) Check the spirit level of the wall and
(
adjust the supports so that they rest completely on the ground.
Then, attach the profile to the metal dowels.
22

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis