Herunterladen Inhalt Inhalt Diese Seite drucken

Task 4: Powering On The System - Promise Technology VTRAK E-Class Kurzanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 26

Task 4: Powering On the System

There is a specific sequence to follow when you power on your VTrak and Mac
system. See Figure 11 below or Figure 12 on page 16.
Power on your system components in the following sequence:
1.
All VTrak J-Class expansion chassis
2.
The VTrak E-Class subsystem
3.
The Mac Client
The VTrak takes a few minutes to fully boot-up and become available to the host.
Figure 11 VTrak and Mac power-on sequence, dual controller
Task 4: Powering On the System
Mgmt
FC 1
FC 2
4
4
2
2
1
1
Gb/s
Gb/s
115200
8 N 1
15
Mgmt
UPS
FC 1
FC 2
4
4
2
2
1
1
Gb/s
Gb/s
115200
8 N 1
UPS
115200
8 N 1
115200
8 N 1

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Vtrak j-class

Inhaltsverzeichnis