Herunterladen Inhalt Inhalt Diese Seite drucken

Wiring Diagram; Initial Start-Up - Qlima Fiorina 74 S-line Installationsanleitung

Vorschau ausblenden Andere Handbücher für Fiorina 74 S-line:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 22
5.
6.
7.
8.
9.
10.
11.

9.1 WIRING DIAGRAM

Figure 14:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

10. INITIAL START-UP

Read the user manual carefully before using for the first time (especially chapter 3).
4
108
A part of the extension cable supplied must be connected to the stove, see
figure 13.
Make sure the extension cable plug fits in the socket.
Before inserting the plug into the socket, make sure that the socket and the
connection cable are intact.
Make sure that the power switch at the back of the stove is turned OFF.
Make sure that the plug is easily accessible so that it can be disconnected
quickly and easily from the socket for maintenance purposes, or in an emer-
gency.
Do not attach the cable.
Buig en knik de kabel niet.
Any damaged power cord or plug should only be replaced by the
supplier, a competent technician or an authorised service technician.
Room temperature sensor
Combustion gas pipe sensor at room temperature
Combustion gas pipe differential pressure switch
Safety thermostat
Pellet screw transmission
Display
Display connection cable
Power-on button
Ventilation chamber
Combustion gas extraction fan
Encoder cable
Printed circuit board

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Fiorina 90 s-lineFiorina 103 s-line

Inhaltsverzeichnis