Be sure to use both a spanner and torque wrench together when
connecting or disconnecting pipes to/from the unit.
1
Torque wrench
2
Spanner
3
Piping union
Flare nut
4
Refer to Table 1 for the dimensions of flare nut spaces and the
I
appropriate tightening torque. (Overtightening may damage the
flare and cause leaks.)
I
When connecting the flare nut, coat the flare both inside and
outside with ether oil or ester oil and initially tighten by hand 3 or
4 turns before tightening firmly.
1
Coat here with ether oil
or ester oil
I
Check the pipe connector for gas leaks.
Be sure to insulate the gas pipe and the liquid pipe separately
I
with
polyethylene
foam
conductivity = 0.041~0.052 kW/mK).
Inside diameter
Gas pipe insulation
12–15 mm
Liquid pipe insulation
8–10 mm
NOTE
For the gas pipe, use a polyethylene foam resistant to
a temperature of 110°C.
When inserting the refrigerant piping in the wall hole, take
care not to let dust or moisture come into the piping.
Protect the pipes with a cap or seal the pipe end
completely with tape.
1
2
1
Dust
2
Moisture
3
Tape
4
Cap
Table 1
Pipe gauge
Tightening torque
14.2~17.2 N•m
Ø6.4
(144~176 kgf•cm)
49.5~60.3 N•m
Ø12.7
(504~616 kgf•cm)
CS-20•25NM1HPP
Urban Multi air conditioner
4PW12341-1A
1
3
4
1
1
insulation
material
(thermal
Wall thickness
8–10 mm
7–10 mm
3
4
Flare dimension A
(mm)
Flare shape
90° ±4
8.3~8.7
A
15.4~15.8
R=0.4~0.8
D
RAIN PIPING WORK
Rig the drain piping as shown in figure and take measures against
condensation. Improperly rigged piping could lead to leaks and
eventually wet furniture and belongings.
2
1-1.5m
1
Hanging bar
1.
Install the drain pipes.
Keep piping as short as possible and slope it downwards so
that air may not remain trapped inside the pipe.
Keep pipe size equal to or greater than that of the connecting
pipe (Vinyl pipe of 25 mm nominal diameter and 32 mm outer
diameter).
Do not use a trap in the drain piping and never put the end of
the hose into water. (See figure 2)
If you extend the drain hose, always insulate it up to the
outdoor side with polyethylene foam insulation material (field
supply).
1
Drain hose fixed to the indoor unit
Indoor side extension drain hose
2
Wall
3
4
Polyethylene foam
To ensure a downward slope of 1:100, install hanging bars
every 1 to 1.5 m.
If unifying multiple drain pipes, install the pipes as shown.
2.
After piping work is finished, check if drainage flows
smoothly.
Make sure that the drain hose is firmly connected.
Pour some water into the drain pan to check if the water flows
smoothly.
WHEN ELECTRIC WIRING WORK IS FINISHED
Check drainage flow during COOL running, explained in chapter
"Test operation".
WHEN ELECTRIC WIRING WORK IS NOT FINISHED
I
Remove the switch box lid and connect the power supply and
remote controller to the terminals. (See figure 7)
1
Power supply wiring
2
Wiring port
3
Indoor PC board
4
Power supply terminal board
5
Transmission wiring between units
6
Remote controller wiring
7
Terminal board for unit transmission wiring
8
Electric parts box lid
9
Wiring diagram
10
Electric parts box
1
Installation and operation manual
3

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Cs-20nm1hpp

Inhaltsverzeichnis