Refrigerant pipe work (continued)
For GUG-02SL-E with PUHZ-ZRP71
1. Insert the flare nut in the field refrigerant piping, pull the insulating
material when performing flare pipe expansion, and put the
insulating material back so that the copper pipe is not exposed.
* Condensation may occur.
Insulating
Pull
material
Put it back
Flare nut
2. Wrap the insulating material around the flare connection and the
field refrigerant piping (no gap should exist) and temporarily fix using
the tape for piping construction. (It will be clipped by the insulating
pipes described in the step 3 to fix.)
Non-glued insulation D
(Accessory)
Refrigerant pipe
(Field supply)
3. Wrap the insulated pipe around the flare area and fix the each
insulating pipe with a tie band.
* Be sure to perform construction so as not to leave a gap on the
insulated pipe joint area. (Condensation may occur in the flared
area.)
Insulated pipe
(Accessory)
Insulating material
can stick out from
the insulated pipe
Refrigerant pipe
(Field supply)
* No gap should exist on the
unit body
Insulated pipe
Joint is the upper side
(Accessory)
(Target: Within the range
of 30° right or left from the
right above)
* No gap should exist
(Condensation may
occur)
4. Wrap the tape for piping construction around the joint between the
insulated pipe and the field refrigerant piping to prevent the insulated
joint from being exposed.
Refrigerant pipe
(Field supply)
(Field supply)
Tape wrapped area
Insulating
material
Flare nut
* No gap should exist
* No gap should exist on
the refrigerant piping body
(Condensation may occur)
Body side
panel
Unit body
* No gap should exist
(Condensation may occur)
[Good example]
[Bad example]
Tie band
(Accessory)
Unit (mm)
Unit body
For GUG-02SL-E with PUHZ-ZRP50
Use Φ12.7 mm for gas pipe and Φ6.35 mm for liquid pipe.
Both PAC-SH30RJ-E and PAC-SH50RJ-E are necessary.
1. Attach PAC-SH30RJ-E and PAC-SH50RJ-E to refrigerant pipes of
Dx-coil unit. For details, refer to their manual.
2. Insert the flare nut in the field refrigerant piping, pull the insulating
material when performing flare pipe expansion, and put the
insulating material back so that the copper pipe is not exposed.
* Condensation may occur.
Insulating
Pull
material
Flare nut
3. Wrap the insulating material E and D around the flare connection
and the field refrigerant piping (no gap should exist) and temporarily
fix using the tape for piping construction. (It will be clipped by the
insulating pipes described in the step 4 to fix.)
Non-glued insulation D
(Accessory)
Refrigerant pipe
(Field supply)
Non-glued insulation E
(Accessory)
4. See No.3 on the Left.
5. See No.4 on the Left.
Insulating
material
Flare nut
Put it back
* No gap should exist
PAC-SH30RJ-E or
PAC-SH50RJ-E
* No gap should exist on
the refrigerant piping body
(Condensation may occur)
Eng-13