Herunterladen Inhalt Inhalt Diese Seite drucken

Connecting The Operating Unit; Checking The Hydraulic Unit; Installing The Hydraulic Hoses - Bosch VLS 3132 H Erstinbetriebnahme

Doppelscheren-hebebühne
Vorschau ausblenden Andere Handbücher für VLS 3132 H:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
en
20 | VLS 3132 H | Assembly
3.3

Connecting the operating unit

3.3.1

Checking the hydraulic unit

1. Remove the screw on the left side of the operating
unit and open the unit.
Fig. 7:
Open operating unit
1 Electric motor
2 Hydraulic unit with connections P, T, P1
3 Hole for bolt
4 Oil tank
2. Check the hydraulic unit:
$
Oil tank must be full.
$
No oil must have escaped.
!
If oil has escaped:
Clean up the oil with a cloth and fill the tank with
hydraulic oil until it is approx. half full.
i
Required hydraulic oil:
Mineral oil according to ISO 6743/4.
Purity level (ISO 4406): max. 18/15.
Examples: IP Hydro Oil 32 or Shell Tellus T 37.
|
1 689 978 571
2011-06-01
3.3.2

Installing the hydraulic hoses

1. Connect the hydraulic hoses of the lifting platform
to the hydraulic unit as per the hydraulic routing
diagram.
Fig. 8:
Hydraulic routing diagram
i
Refer to section 7 for the hydraulic diagram.
Robert Bosch GmbH

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis