Herunterladen Inhalt Inhalt Diese Seite drucken

Terminal Assignment - Lenze L-force E94APNE 4 serie Montageanleitung

Versorgungsmodul
Inhaltsverzeichnis

Werbung

6.3.3

Terminal assignment

The wiring area of the power terminals is designed for the cables being routed upwards
and/or downwards. Usually the AC mains cables come from above. When filters are used,
the connection cables are fed from below (for filters mounted beside the module) or from
above (for filters mounted above the module). The protection against contact in the cover
can be removed accordingly.
To improve the cable handling, the cable cross−section can also be divided onto two cables.
The ring cable lugs used must not exceed the dimensions specified here.
E94APNE1004 (device size 4, connection M8): max. cable lug width 20 mm
ƒ
E94APNE2454 (device size 5, connection M10): max. cable lug width 33 mm
ƒ
Fig. 6−3
EDK94PNE245 DE/EN/FR/ES/IT 4.0
Arrangement of the power connections
l
Wiring the device
Wiring
Terminal assignment
6
S94PN10050
63

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis