Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
> Screw off the pressure screw (11) and remove
together with the pressure piston and pressure
cylinder (12).
> Tilt the jack and remove the valve unit (13) with a
suitable tool.
> Clean valve unit (14) with compressed air.
Assembly is done in the opposite order. During assembly,
tighten the pressure screw (11) to a torque of 100 Nm.
© JUNG Hebe- und Transporttechnik GmbH
11
12
14
13

5.4 Repair

Necessary repairs are carried out by JUNG according to a
cost estimate, at short notice and at a reasonable price.
Contact details can be found on the back of the operating
instructions.
If a repair should be required, please send either the
pump unit of the
JH 6 G plus - JH 20 G plus or the complete
JH 6 G plus - JH 20 G plus device without the pump lever.
Jacks of the JH / JH EX / JHS series
- 63 -

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis