Herunterladen Inhalt Inhalt Diese Seite drucken

Getting Started - Siemens WSx6 Serie Bedienungs- Und Montageanleitung

Ultraschall-wärme- und wärme-/kältezähler
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
Previous month's values "LOOP 2"
Previous month's values
Log date
Energy quantity on set
day
Cooling registers on set
day (optional)
Volume on set day
Missing time on set day
Max. flow on set day in 2
s cycles with date stamp
General/Communication "LOOP 3"
General/Communication
Device number,
7-digit
Optional interface
Primary address (only for
M-Bus)
Secondary address
7-digit - for M-Bus
Other "LOOP 4"
Other
Date
Time
4.1
Monthly values
The meter stores the following values for 24 months on the
monthly set day
Missing time
Volume
Energy
and the maxima with date stamp for
Flow
Power
Temperature hot side
Temperature cold side
4.2
Parameterization
When the LCD displays the code input, you can access the
parameterization operation by entering the code. You can set
date and M-Bus primary address in the parameterization oper-
ation for example. For more detail see the separate parameter-
ization instruction.
5.

Getting started

For activation proceed as follows:
Open the slide valves slowly.
Check the heating system for leak-tightness.
Vent the heating system carefully.
Press the button on the meter briefly.
The message "F0" disappears after 10 sec.
Check the measured values for flow and temperatures for
plausibility.
Siemens Building Technologies
Max. power in 2 s
cycles with date
stamp
Max. temperature hot
Error messages for incorrect installation:
side in 2 s cycles with
date stamp
Max. temperature cold
side in 2 s cycles with
date stamp
Yearly set day
6.
Monthly set day
If the respective operation thresholds are exceeded and flow
and temperature difference are positive, the meter summates
Firmware version
the energy and the volume.
CRC-Code
For a positive flow the activity display
loop in the LCD.
All segments of the display are switched on for control purpos-
es during the segment test. The flow, power and temperature
difference are recorded with the appropriate +/- signs.
Code entry for test /
The operating hours are counted from the first connection of
para operation
the power supply. The meter saves "operating time with flow"
as soon as a positive flow is recognized. Missing hours are
summated if there is a fault and the meter is thus unable to
take a measurement.
Stored maximum values are marked with an „
right hand area of the LCD.
A6V11285667_----_b
If needed vent the heating system until the flow display is
stable.
Fit the user locks to the fittings and the temperature sen-
sors. The scope of supply includes two self lock seals for
sealing a sensor and the connecting fitting.
Read the meter status for energy, volume, operation and
missing time and note the values.
Error "incorrect flow direction (negative)"
Check that the flow direction arrows on the volume measurement unit
match the flow direction of the system. If the directions do not match,
turn the volume measurement unit by 180°.
Error "negative temperature difference"
Check whether the sensors are installed in the right circular flow (flow
and return flow interchanged). Use only a meter suitable to the mount-
ing place.
Heat meter:
Temperature sensor in the flow-pipe with higher temperatures; temper-
ature sensor in return-pipe with lower temperature
Cooling meter:
Temperature sensor in the flow-pipe with lower temperatures; tempera-
ture sensor in return-pipe with higher temperature
Functional details
If the operate margin is gone below a "u" is displayed at a leading
point for the flow, power and temperature display.
appears in the user
"in the lower
05.06.2018
12

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis