Herunterladen Diese Seite drucken

RM 69 RASKE & VAN DER MEYDE EDAM Installationsanleitung Seite 7

Vorschau ausblenden Andere Handbücher für RASKE & VAN DER MEYDE EDAM:

Werbung

Operation
Operation
Flushing: The double lever must be
placed in the "flush" position (red).
By moving the pump handle up and down
in an upright position, water will be drawn
into the bowl and then will be transported
with the toilet waste through the dischar-
ge line in open water or into the waste
tank. Pumping several strokes after the
bowl has been flushed will help to clear
the lines.
Emptying: Put the double lever, after
flushing, in the "empty" position (yellow). The toilet will only pump out water
and no water is brought into the bowl. Pumping several strokes after drying
the bowl prevents the backflow of the water.
Lock: Push the pump handle downwards and next put the handle in the
"lock" position (green). Both the inlet and outlet lines are locked.
No water can come in.
Attention: The lock position doesn't give a 100% safety; hoses can
break down. Therefore close all sea cocks during longer absence and
also during the night.
7

Werbung

loading