Herunterladen Inhalt Inhalt Diese Seite drucken

Getting Started - Belkin OmniView PRO3 Benutzerhandbuch

Vorschau ausblenden Andere Handbücher für OmniView PRO3:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 98
Installation
Example of Daisy-Chain Configuration
cable 1
cable 2
cable 3

Getting Started:

Step 1: Make sure that all servers and PRO3 KVM Switches are powered off and
that each PRO3 KVM Switch has been assigned a unique BANK address.
Step 2: Place all primary and secondary KVM switches in the desired location.
Step 3: Connect the console monitor, keyboard, and mouse to the console ports
of the primary switch (BANK 00). Refer to "Connecting the Console to the PRO3
KVM Switch" on page 14.
22
22
Primary unit (BANK 00)
Secondary unit ( BANK 01)
Secondary unit ( BANK 02)
Secondary unit ( BANK 03)

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis