Herunterladen Inhalt Inhalt Diese Seite drucken

Viatom BP1 Handbuch Seite 13

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Electrostatic
discharge
(ESD) IEC
61000-4-2
Electrical fast
transient/bur
st
IEC 61000-4-4
Surge
IEC 61000-4-5
Voltage dips,
short
Interruptions
and Voltage
variations on
power supply
input lines
IEC 61000-4-
11
± 6 kV contact
± 8 kV air
± 2 kV for power
supply lines
±
1
kV
for
input/output
lines
± 1 kV line(s) to
line(s)
± 2 kV line(s) to
earth
<5 % UT
(>95 % dip in UT)
for 0.5 cycle
40 % UT
(60 % dip in UT)
for 5 cycles
70 % UT
(30 % dip in UT)
for 25 cycles
<5 % UT
(>95 % dip in UT)
for 5 s
±
6
kV
contact
± 8 kV air
± 2 kV for
power
supply lines
± 1 kV for
input/outp
ut lines
1
kV
±
line(s) to
line(s)
±
2
kV
line(s) to
earth
<5 % UT
(>95 % dip
in UT)
for 0.5 cycle
40 % UT
(60 % dip in
UT)
for 5 cycles
70 % UT
(30 % dip in
UT)
for
25
cycles
<5 % UT
(>95 % dip
13
Floors should be wood,
concrete
or ceramic tile. If floors
are
covered with synthetic
material,
the relative humidity
should be at
least 30 %.
Mains power quality
should be that of a
typical commercial or
hospital environment.
Mains power quality
should be that of a
typical commercial or
hospital environment.
If the user of our
product
requires
continued
operation
during power mains
interruptions,
it
recommended
our
product
powered
from
uninterruptible power
supply or a battery.
is
that
be
an

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Bp1a

Inhaltsverzeichnis