Herunterladen Inhalt Inhalt Diese Seite drucken

Upkeep And Maintenance - Siemens SCALANCE WLC711 Kompaktbetriebsanleitung

Industrial wireless lan controller simatic net
Vorschau ausblenden Andere Handbücher für SCALANCE WLC711:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.3
Connect to the network
Connect to the network
Steps for connecting the device to the network
1.
Plug the network cable for the connection to the access
points in the socket
2.
A connection to the management station can be made
using the socket
5.4
Operator controls
On/Off switch
CAUTION
The On/Off switch does not disconnect the device from the supply voltage.
Position of on/off switch
6

Upkeep and maintenance

6.1
Replace the backup battery
To be noted before you replace the battery
Note
The service life of a backup battery is approximately 5 - 8 years, depending on the operating conditions.
SCALANCE WLC711
A5E03740572-05, 04/2016
: LAN1: X2 P1 (interface "esa0").
: ADMIN: X2 P2 ("admin" interface).
Pos
Description
The on/off switch turns off the output voltages of
the power supply but not disconnect from the
supply system.
The delivery condition is: On/Off switch turned
off.
23

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis