Herunterladen Inhalt Inhalt Diese Seite drucken

Contractor ECO-80P Bedienungsanleitung Seite 30

Vorschau ausblenden Andere Handbücher für ECO-80P:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

until visibility decreases, which ever comes Àrst. At that point turn the pulse regulator to 4,5
bar, to start the normal pulsing cycle.
5.2.8 Pop-up Valve Seat Replacement
The rubber popup seat can be replaced after removing the blast vessel from cabinet
hopper (See blast vessel user manual). Remove the old seat by using a À nger, screwdriver, or
similar object, to work the seat out of the retainer groove. Push the new seat all the way through
the port and then À t it into the groove. For the last few millimeters pull up on the rubber seat and
allow it to « pop» into position.
30
Picture 12. Pop-up Valve and O-ring
Replacement
CONTRACOR
®
Version 2.3

Werbung

Kapitel

Inhaltsverzeichnis
loading

Verwandte Produkte für Contractor ECO-80P

Inhaltsverzeichnis