GB
Installation instructions drive set DirectPower
The mounting rail with the preassembled controller box is fixed to the
downtube with screws.
The controller box is already prepared for the electrical connection of the
components. All cables are already led out. Except the cable for bicycle
lighting all are fitted with plug connectors.
These are:
> Display
> Torque sensor
> Motor supply cable
> Motor signal cable
> Bicycle lighting
> Cable for the regeneration signal from the brakes, where
applicable
If not existing yet the downtube has to be equipped with four screw
threads size M5. See following figure for details.
11