Herunterladen Inhalt Inhalt Diese Seite drucken

HEINZMANN DirectPower Einbauanleitung Seite 25

Fahrradantriebssystem
Vorschau ausblenden Andere Handbücher für DirectPower:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

GB
3.5.3 Laying cables and creating electrical connections for both battery versions
Installation instructions drive set DirectPower
 Install mounting rail with controller box at the downtube using 4 pcs.
countersunk head screws, frame adapters and elastic pads.
See following figure for details.
Screw size: M5×16,
mounting torque: 1 Nm ± 0,1 Nm.
 All component cables are prepared with the correct length and fitted
with suitable plug connectors, except the cable for bicycle lighting.
The cables must be laid without kinks.
Cables, which are subject to movement (e.g. in the steering area) must
be laid with sufficient additional length in the form of loops.
Abrasion points must be avoided when laying the cables. Use
additional protective casing if necessary.
 Create electrical connections using the plug connectors
 Only then all cables should be finally fixed in place on the bicycle
with cable ties or similar fasteners.
CAUTION:
Cables must be laid in a way that tractive forces keep as
small as possible.
Admissible tractive force: max. 80 N!
12

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis