Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Commissioning - Emerson Liebert XDK-W Handbuch

Rack enclosure with integrated liquid cooling
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

CoolTherm
Manual / Bedienungsanleitung
upper and lower
transport-lock
screw

Initial Commissioning:

-
unfix upper and lower transport lock screw
-
connection with general power supply
Automatic door opening operates approx. one minute after initialisation of fan
control unit
-
see: Manual closing
-
Attention:
If in the time of commissioning the power supply is broken, the doors open itself. If you
use the transport lock screws again,
use always both transport lock screws, otherwise the door could be
damaged.
-
Adjusting Magnet Plate:
CoolTherm
01_998_330_0_k
adjusting screw
for upper
magnet plate
Door opening
switch with LED
(green)
adjusting screw
for bottom
magnet plate
page / Seite 32/98

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis