Pipe installation

Pipe installation must be carried out in accordance with
current norms and directives.
Internal support bushes must be fitted, when a plastic
or annealed copper pipe is used. The water heater must
be fitted with the requisite valves, such as a safety valve,
shut-off valve, non-return valve and vacuum valve. An
overflow pipe must be routed from the safety valve to
a suitable drain. The overflow pipe must be the same
size as the safety valve. Route the overflow pipe from
the safety valve, enclosed along its entire length and
ensure that it is frost proof. The mouth of the overflow
pipe must be visible and not placed close to electrical
components.
The water heater is equipped with two outgoing
docking connections to allow docking from either side
of the hot water heater.
A drain valve can be fitted to the G1½" connection (use
an adapter from G1½" to the required size) which is
not used for docking.
Connection VPA 300/200-Cu
XL3 Cold water Ø
XL4 Hot water Ø
XL5 Hot water circulation Ø
XL8 Docking connection, supply line
XL9 Docking connection, return line
XL35 Immersion heater connection
FR1 Submerged tube int. Ø
Connection VPA 300/200-E
XL3 Cold water ext.
XL4 Hot water ext.
XL5 Hot water circulation ext.
XL8 Docking connection, supply line
XL9 Docking connection, return line
XL35 Immersion heater connection
FR1 Submerged tube int. Ø

Electrical connections

NOTE
Electrical installation and service must be car-
ried out under the supervision of a qualified
electrician. Electrical installation and wiring
must be carried out in accordance with the
stipulations in force.
VPA 300/200 can be supplemented with up to two
immersion heaters. Connection dimension is G22" and
max immersion heater length is 650 mm.
Commissioning and adjusting
Filling
The water heater
The water heater is filled by first opening a hot water
tap in the system and then opening the shut-off valve
for incoming cold water. This valve must then be fully
open during operation. The hot water tap can only be
shut off when the water heater is filled, which is when
only water comes out of the tap (initially an air-water
mixture comes out of the tap).
Heating system
When filling the heating system, the double-jacketed
space must be vented by opening the air nipple. The
air nipple may only be closed when water starts coming
out of the air hole.
Hot water capacity
Charge power
(kW)
28 mm
4
28 mm
7
15 mm
10
G1½"
15
G1½"
G2"
NL number According to DIN 4753
T50: Heating time from 10 to 50 °C
11 mm
Vmax: Maximum hot water quantity at 55 °C in the water heater.
12 l/min produces 420 litres 40 °C mixed water.
G1"
G1"
G¾"
G1½"
G1½"
G2"
11 mm
NL number
T50 (minutes)
2,5
250
2,75
160
3,0
110
3,25
75