Herunterladen Inhalt Inhalt Diese Seite drucken

Installing Without Support En; Fastening The V-Block En; Mounting The Milling Cutter En - Abicor Binzel BRS-LCi Betriebsanleitung

Brennerreinigungsstation
Vorschau ausblenden Andere Handbücher für BRS-LCi:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6 Putting into operation
6.2 Installing without support
 Abb. 4 Putting into operation on page EN-11
 3.1 Technical Data on page EN-7
1 Position cleaning station (3) with two cylindrical pins (1) on a vibration-free mounting surface and fix it
with four screws (4).
2 Fasten collecting tray (5) below the motor by means of two screws (9).
3 Fasten drain of collecting tray (5) with a hose (ø= 8mm) to a suitable collecting container. If none is used,
you must seal the drain (thread G 1/8").
4 Fasten bottle holder (6) in the vicinity of the cleaning station.
6.3 Fastening the V-block
1
Prism
Abb. 5
Prisma befestigen
1 Screw the V-block (1) into the clamping device (2) from above.
2 Screw in the cylinder screw (3).
6.4 Mounting the milling cutter
1
Clamping device
Abb. 6
Mounting the milling cutter
NOTICE
• Only use appropriate tools with a suitable width across flats when changing the milling cutter. Milling
1 Insert the milling cutter (2) into the clamping device (1).
2 Secure the milling cutter (2) by means of tools (3).
EN - 12
2
Clamping device
1
2
Milling cutter
cutter seat SW 27, milling cutter SW 17.
1
2
3
3
Cylinder boltM5x20
2
3
3
Tool
BRS-LCi
BAL.0149.0 • 2017-05-17

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis