4.
Obligations of the plant
operator
4.1

Operation of lifting platforms

In Germany, the use of lifting platforms is governed
by the mandatory "Employers' liability insurance
association regulations on health and work safety
as defined in BGR 500 Section 2.10". In all other
countries, the applicable national regulations, laws and
directives must be observed.
4.2

Checking of lifting platforms

Checks are to be based on the following directives and
regulations:
R
Basic principles for testing lifting platforms (BGG 945)
R
The basic health and safety requirements stipulated
in the directive 2006/42/EC
R
Harmonized European standards
R
The generally acknowledged rules of engineering
R
The directive on the use of equipment 89/655/EEC
R
The applicable accident prevention regulations
The checks are to be organized by the user of the
lifting platform. The user is responsible for appointing
an expert or qualified person to perform checking.
It must be ensured that the person chosen satisfies the
requirements of BGG 945 as per Section 3.
!
The user bears special responsibility if employees of
the company are appointed as experts or qualified
persons.
4.2.1

Scope of checking

Regular checking essentially involves performing a
visual inspection and a functional test. This includes
checking the condition of the components and
equipment, checking that the safety systems are
complete and functioning properly and that the
inspection log book is completely filled in.
The scope of exceptional checking depends on the
nature and extent of any structural modification or
repair work.
4.2.2

Regular checking

After initial commissioning, lifting platforms are to be
checked by a qualified person at intervals of not longer
than one year.
A qualified person is somebody with the training and
experience required to possess sufficient knowledge
of lifting platforms and who is sufficiently familiar
with the pertinent national regulations, accident
prevention regulations and generally acknowledged
rules of engineering (e.g. BG rules, DIN Standards, VDE
provisions, the technical regulations of other European
Robert Bosch GmbH
Obligations of the plant operator | VLH 4x45 LA | 25
Union member states or other parties to the agreement
in the European economic area) to be able to assess
the safe operating condition of lifting platforms.
4.2.3

Exceptional checking

Lifting platforms with a lift height of more than
2 meters and lifting platforms intended for use with
people standing under the loadbearing elements or
the load are to be checked by an expert prior to re-use
following structural modifications and major repairs to
loadbearing components.
An expert is somebody with the training and experience
required to possess specialist knowledge of lifting
platforms and who is sufficiently familiar with the
pertinent national work safety regulations, accident
prevention regulations and generally acknowledged
rules of engineering (e.g. BG rules, DIN Standards, VDE
provisions, the technical regulations of other European
Union member states or other parties to the agreement
on the European economic area) to be able to check
and give an expert opinion on lifting platforms.
4.3

Inspection log

An inspection log is to be kept as a record of the lifting
platform checks performed. The inspection log book
must contain a report on the test performed prior to
initial commissioning and the regular and exceptional
checks, as well as the applicable certification on (EC)
type testing and the EC declaration of conformity.
The report must include:
R
The date and scope of testing with details of any
test items not yet performed
R
The results of the test with details of any
shortcomings established
R
An assessment of whether there are any
impediments to start-up or further use
R
The details of any follow-up testing required
R
The name, address and signature of the person
carrying out the checks
i
The acknowledgement and rectification of any
shortcomings found must be confirmed by the plant
operator in the report.