Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Positioner / Process Controller On Process Valves Belonging To Series 26Xx And 27Xx - Alfa Laval 8693 Anleitung

Positioner / prozessregler
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

8.3. installing the positioner / process
controller on process valves
belonging to series 26xx and 27xx
procedure:
Fig. 9:
Aligning the puck holder
Push the positioner / process controller onto the actuator. The
puck holder must be aligned in such a way that it is inserted into
the guide rail of the positioner / process controller.
noTe!
damaged printed circuit board or malfunction!
• Ensure that the puck holder is situated flat on the guide rail.
Press the positioner / process controller all the way down as far
as the actuator and turn it into the required position.
Type 8692, 8693
Installation
Guide rail
Puck holder
Ensure that the pneumatic connections of the positioner /
process controller and those of the actuator are situated
preferably vertically one above the other (see "Fig. 10").
noTe!
too high torque when screwing in the fastening screw does
not ensure protection class ip65 / ip67!
• The fastening screws may be tightened to a maximum torque of
0.5 Nm only.
Attach the positioner / process controller to the actuator using
the two side fastening screws. In doing so, tighten the screws
only hand-tight (max. torque: 0.5 Nm).
Pilot air outlet 2
Pilot air outlet 2
Fastening screws
max. 0.5 Nm
Upper pilot air port
Lower pilot air port
Fig. 10: Installing the pneumatic connection to actuator, series 26xx and
27xx
english
1
2
17

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Alfa Laval 8693

Diese Anleitung auch für:

8692

Inhaltsverzeichnis