Herunterladen Diese Seite drucken

Eibenstock ETN 162/3 Originalbetriebsanleitung Seite 26

Vorschau ausblenden Andere Handbücher für ETN 162/3:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Rig Drilling
Since the drill rig does not belong to the supply, some of its most
important features are described here.
For this purpose, please refer to the drill rig's operating instructions.
Fixing to Drill rig
Vacuum fastening:
For the vacuum, make sure that it is sufficient (minimum -0.8 bar). Make
sure that the gaskets are not worn.
Attention! Do not use the vacuum fastening on the wall or overhead!
Please ensure that the leveling screws are adjusted in such a way that they
do not protrude from the underside of the drill stand foot, otherwise the
vacuum is affected and the stand may come away from its support.
Dowel fastening:
The most common way of fixing is dowel fixing.
If possible, use only metal dowels. The dowel diameter must not be
smaller than 12 mm.
In order to fasten the drilling unit correctly, you need the fastening set
(order number 35720).
Drill a hole with a diameter of 15 mm, 50 mm deep. Make sure that
the hole is free of dust.
Insert a dowel and open it with an expanding mandrel.
Screw the thread rod into the dowel.
Put the drilling unit with the deep hole in the base onto the thread rod.
Place the washer and screw the butterfly nut very tightly.
Adjust the drilling unit in the platform by using the four screws.
The ETN 162/3 is equipped with a special
accomodation for the diamond drill rig BST 182 V/S.
For mounting the tool to the drill rig, the handle may
remain at its place.
Move the machine holder upwards until it locks in
the top position.
Open the fixing by turning the locking screw with the
feed lever until the guideway is free
Insert the tool into the drill rig.
Fix the tool by turning the locking screw with the
feed lever.
In doing so, the screw must engage the hole in the
v-block.
25

Werbung

loading